Saturday, 31 October 2015
Thursday, 29 October 2015
Tuesday, 27 October 2015
Monday, 26 October 2015
Sunday, 25 October 2015
Thursday, 22 October 2015
槟巫统表态愿与伊党合作, 黄汉伟要求马华民政解释
刘嘉铭
18 小时前 发布
18 小时前 更新
18 小时前 更新
巫统槟州联委会主席再纳阿比丁日前表示,槟州巫统准备与伊斯兰党合作,因为此举对双方都有好处。针对此,槟州民主行动党财政黄汉伟要求,槟州马华与民政表明立场。
“马华民政,你怎么说?”
纳阿比丁前天在大山脚表示,槟州巫统准备与槟州伊斯兰党合作,因为不愿见到马来族群分裂及意见分歧。不过,需得到两党最高领导层的同意。
黄汉伟(见图)今天发文告表示,对巫统的言论感到吃惊,因为之前槟州马华及民政高姿态攻击行动党与伊党的合作。当民主行动党宣布与伊党割席绝交,民联终结后,马华及民政的文告依然箭指行动党。
“现今槟巫统却准备与伊党合作,马华民政,您怎么自圆其说?”
他认为,槟巫统单独宣布准备与伊斯兰党合作一事,根本不把马华民政放在眼里,而恰恰证明马华民政在国阵力量完全被边缘化。
民政将带入会议了解
槟州民政党秘书胡栋强接受《当今大马》电访时表示,伊党的神权治国理念不符合国阵的政治路线,希望再纳阿比丁不要相信伊党。
“在国阵精神下,巫统不能单独宣布跟任何不符国阵理念的政党合作,否则将破坏成员党间的合作关系。”
“当然,我们愿意跟任何人合作,但要建立在彼此共同相信的理念上。伊斯兰党相信的是神权政治,我们却一直秉持多元种族的路线,尽管国阵成员党有本身的斗争,但都坚信和维护此原则。”
基于再纳阿比丁的言论代表槟州巫统,他说,槟州民政党将在槟国阵的会议上向再纳阿比丁了解有关言论的动机和目的。
抨自导自演反收费站
另一方面,针对峇眼区国阵青年团提醒槟首长林冠英记得承诺,向联邦政府争取废除北海双溪育收费站,黄汉伟提醒,前者不要自导自演,自己设立收费站和起价后又在自家的收费站前示威误导群众。
“溪育收费站是国阵与特许经营大道公司签下的合约,国阵是始作俑者,那么,峇眼国阵又何必演戏呢?”
他说,行动党一旦执政中央将行使其行政权检讨及废除双溪育收费站,但由于还未入主布城,所以上述愿望暂时还未实现。
“不过槟州政府已兴建人民之路(北海峇眼29路),省下沉重的过路费。槟州政府体恤人民,兴建一条替代路让民众避开双溪育收费站,加上衔接‘人民之路’的北海西南路扩建工程即将于月杪完成,该处的交通会大有改善。民众可绕开收费站,使用人民之路。”
大道收入已远超成本
黄汉伟点出,国阵政府当年把该条原本免费行驶的道路私营化收费时,民主行动党及民众都大力反对,但国阵如今更毫无顾及人民利益,变本加厉大涨140%。
“这收费相信将大幅增加大道公司收入,甚至远超成本。”
“与其在属于联邦管辖的双溪育收费站前剑指财政部长纳吉,峇眼国阵却转而攻击槟州政府及槟首长,刻意扭曲及掩盖事实。”
“请问峇眼国阵除了在自家收费站前开记者会之外,又做了些什么呢?”
Wednesday, 21 October 2015
Monday, 19 October 2015
Thursday, 15 October 2015
Wednesday, 14 October 2015
Tuesday, 13 October 2015
Upgrading Road, Drain To Solve Flash Flood At Jalan Thean Teik
Posted By: Administratoron: October 13, 2015In: Nation, News, Penang
GEORGE TOWN, Oct 13 - DAP Air Itam state assemblyman Wong Hon Wai hold a press conference today at Jalan Thean Teik on Monday morning said they will upgrading the road and drain to solve the flash flood at Jalan Thean Teik which in front the road of Sunshine Farlim Shopping Mall.
He said the flash flood problem along Jalan Thean Teik is expected to be solved in the coming middle of 2016. The currently road of the widening and drain upgrading project is in progress. This development is expected to solve flood problem approximately 200 meters stretch from Treasure View apartments to Sungai Dongdang.
“Flash flood usually occur when there is a heavy downpour, and the existing drainage could not cope with the execessive water, that is slow to flow into Sungai Dongdang. Who says developments caused flash flood ? In this case in Air Itam, development through road widening and drainage update will take care of flood problem,” said Wong.
He added that normally continous heavy rain for around 30 minutes, will cause flooding up to one foot along Jalan Thean Teik. The road widening and drain upgrading project will be undertaken by the developer of Farlim Group (M) SdnBhd. Its senior project executive Chew Kwong Wey said the exisiting two lanes along Jalan Thein Teik will be upgrade to four lanes and the drain of 0.3m width will be extended to 1.2m.
Read More At: http://www.pocketnews.com.my/2015/10/13/upgrading-road-drain-to-solve-flash-flood-at-jalan-thean-teik/ | Pocket News
Monday, 12 October 2015
Subscribe to:
Posts (Atom)